Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Al Sabah, R (2014) Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms, Unpublished PhD Thesis, , University of Wisconsin - Madison.

  • Type: Thesis
  • Keywords: coordination; failure; market; construction project; equipment; natural resources; export; inflation; markets; productivity; regulation; subcontractor
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1526021023
  • Abstract:
    Multinational firms working on construction projects often encounter significant risks beyond those encountered by local firms. Although risk mitigation measures are used when venturing into international markets, there has been little research into evaluating the impact of risks on project and firm performance in the Arabian Gulf Region (AGR). Risks are identified through an extensive data collection process from multinational companies with significant work experience in the AGR. The impact of these risks on four performance metrics is descriptively evaluated using Relative Importance Index (RII), Significance Score (SS), Risk Mapping Matrix (RMM) and Principal Component Analysis (PCA) for validation. The results indicate that firms are potentially exposed to a total of 27 external risks divided into political, economic, legal, natural, and social categories, and 47 internal risks divided into design, construction, financial, management, and maintenance categories. Of the 27 external risks, war threat, political instability, price inflation, resource availability and quality, authorities and regulation requirements, and inclement climate have the most significant impacts on the four performance metrics considered. Of the 47 internal risks, defective late design documents, constructive changes, and insufficient scope definition in the management risk category have the most significant impacts on the four performance metrics. Multivariate data analyses revealed that six out of the 27 external risks, including nationalism and local protectionism, permits and licenses, inclement climate, resource availability and quality, import and export restrictions and war threat had substantial influence over projects’ overruns. Of the 47 internal risks, defective/late design documents, long lead material/equipment, insufficient scope definition, equipment and labor productivity, inadequate schedule, and constructive changes, inaccurate supplemental design information, error in bids/quotation, and differing and unforeseen site conditions and coordination between subcontractors were found to have an influence over projects’ failure with regard to schedule or cost. Based on that, multinational firms seeking to work in AGR or similar countries that are rich in natural resources but experience significant political instability can use these findings as a guide to establish effective risk mitigation plans that reduce adverse effects on project and company performance.

Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ammar, A I (2001) Profitability of electrical contractors using financial and economical data: The effect of company's size, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chen, Y (2008) A highway work zone design and traffic management decision system, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chin, C-S (2008) An investigation to improve construction information flows, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Choi, K (2008) Applications of its archived data for improved highway planning and design, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Daegu, C (2009) Construction information database framework (CIDF) for integrated cost, schedule, and performance control, Unpublished PhD Thesis, , University of Wisconsin - Madison.

De Cicco, S (2004) Design and development of an information management system for highway construction specifications, Unpublished PhD Thesis, , University of Wisconsin - Madison.

El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Gunduz, M (2002) Change orders impact assessment for labor intensive construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Iskandar, K A S (2018) A new comprehensive mathematical assessment methodology for team collaboration and integration and project performance in healthcare construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Kang, M M K (2014) Development of an expert system for sustainable pavement preservation strategies (es2p2s), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, J C (2010) Evaluating the sustainability of construction with recycled materials, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, S (2000) Spatial model and decentralized path planning for construction automation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, T S (1990) Detection of collusion in highway construction contract bidding, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Lukito, P K (2000) A framework for environmental monitoring infrastructure investment planning in developing areas, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Menches, C L (2006) Effect of pre-construction planning on electrical project performance, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Onaran, B E (1996) The construction of professional identity in architecture and landscape architecture: Convictions about skills, knowledge, and professional roles in design, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Paap, K (1999) Masculinity under construction: Gender, class, and race in the construction industry, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Rungjang, K (2013) Public investment for developing port facilities within competitive market, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Schwab, A (2000) Management practices in short-term network organizations: The performance impact of the shadow of the future and psychological contracts in the United States movie industry, 1931--1940, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Swider, S C (2008) Behind great walls: Modes of employment among migrant construction workers in China's informal labor market, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Yi, J S (2003) CAMP (CAse Matching Prediction): A dynamic forecasting model for periodic expenditures of residential building projects, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Yoo, Y J (2014) The development of green building performance assessment tool (GBPAT), Unpublished PhD Thesis, , University of Wisconsin - Madison.